1. CCTV SYSTEM in Duba power plant (SEC) as a subcontract for United Matbouli Company
The scope of the project include
* fiber optic network cover the Duba power plant
* Supply and installation fiber cables and all accessories
* Fabrication and installation Poles for Cover all Duba Power Plant
* Supply and Installation IP-Camera – For All the site .
* Connecting all fiber cable To control system room
* Make the required testing and commissioning for the network
* Make all civil work related to The project
2. CCTV SYSTEM in Alwagh power plant(SEC) as a subcontract for United Matbouli
company
The scope of the project include
* fiber optic network cover the Alwagh power plant
* Supply and installation fiber cables and all accessories
* Fabrication and installation Poles for Cover all Alwagh Power Plant
* Supply and Installation IP-Camera – For All the site .
* Connecting all fiber cable To control system room
* Make the required testing and commissioning for the network
* Make all civil work related to The project
3. Fire Alarm systems
In Duba power plant (SEC) as a subcontract for Giza Al-Arabia Company
The scope of the project include
* Supply and Installation Fire Cables cover the Duba power plant
* Delivering and Installation all Fire Panel- smoke detector – heat detector – sounders –flashers – brokers
* Make the required testing and commissioning
* Make all civil work related to The project
4. Fire Alarm system
In ALWAGH power plant (SEC) as a subcontract for Giza Al-Arabia Company
The scope of the project include
* Supply and Installation Fire Cables cover the ALWAGH power plant
* Supply and Installation all Fire Panel- smoke detector – heat detector -sounders –flashers – brokers
* Make the required testing and commissioning
* Make all civil work related to The project
5. Fire Fighting (Foam Monitor) system
Installation in Duba Power Plant (sec) as subcontract for Giza Al-Arabia Company
The scope of the project include
* Installation Foam Fire fighting system in the Duba power plant
* Supply and installation Valves – Nozzles- pipes –foam cylinders
* Make fitting for fighting system network.
* Supply and installation sprinkler system
* Make the required testing and commissioning
* Make all civil work related to The project
* Fabrication and installation of meatal base with handrail for foam monitor.
* Connecting the Fire fighting system with the fire alarm system and other system in Duba Power Plant
6- Replacement of Control and Protection System for Units# 1 – 6 at Tabouk
Power Plant #2
As a Subcontract for Giza Al-Arabia Company Project No:PC0415
The scope of the project include
* Laying UPS power cables ,DC power Cables ,Ethernet Cables ,Multi-core signal cables.
* Install UPS Power Distribution Panel , Batteries ,Battery Charger.
* Install Network Panel and GPS antenna for WAN .
* Modifying the Exiting Operation Console
* Dismantling of exiting Mark-II ,Mark-V Cabinet.
* Installation New Mark-VI Cabinet.
* Dismantling of exiting Excitation Cabinet.
* Installation New EX2100e Excitation Cabinet.
* Make all Mechanical work required for the work.
* Make all the wiring required for the work
7- Replacement of Control and Protection System for Units# 1 – 3 at Al Wajh
Power Plant
As a Subcontract for Giza Al-Arabia Company Project No:PC0615
The scope of the project include
* Laying UPS power cables ,DC power Cables ,Ethernet Cables ,Multi-core signal cables.
* Install UPS Power Distribution Panel , Batteries ,Battery Charger.
* Install Network Panel and GPS antenna for WAN .
* Modifying the Exiting Operation Console
* Dismantling of exiting Mark-II ,Mark-V Cabinet.
* Installation New Mark-VI Cabinet.
* Dismantling of exiting Excitation Cabinet.
* Installation New EX2100e Excitation Cabinet.
* Make all Mechanical work required for the work.
* Make all the wiring required for the work
8- Replacement of Control for Units# 1 – 6 at Duba Power Plant
As a Subcontract for Giza Al-Arabia Company Project No:PC0515
The scope of the project include
Laying UPS power cables ,DC power Cables ,Ethernet Cables ,Multi-core signal cables.
* Install UPS Power Distribution Panel , Batteries ,Battery Charger.
*Install Network Panel and GPS antenna for WAN .
* Modifying the Exiting Operation Console
* Dismantling of exiting Mark-II ,Mark-V Cabinet.
* Installation New Mark-VI Cabinet.
* Make all Mechanical work required for the work.
* Make all the wiring required for the work
9- Upgrade fuel control system:
As a Subcontract with Saudi for electronics company (SETRA) In Tabouk Power Plant
#2
*The scope of the project include
*Installation New flow meters
*Instantiation Temperature measurement,
*Installation Pressure transmitting
*Modify piping system
*Connect the system with fiber link with control room in PP2.
10- Lighting Poles In Al-Falah District
Include supply and installation of light poles and all required electric and civil work
related to finish the work
11- Lighting poles (High Must ) In Driving School For Ladies
Include supply and installation of light poles and all required electric and civil work
related to finish the work
13- COOLENGEL SS POWER TRANSFORMER 11KV M.V SWGR
- 40MVA TR with all accessories
- Cable tray and steel support
- CAPACITOR BANK
- H.V cables from GIS to TR ( trough SWGR building )
- M.V cables from TR to M.V SWGR
- M.V cables from M.V SWGR to AUX TR
- Control cables with termination ( for all equipment )
- Earthing grid connecting to exiting grid & lighting protection
15- ASYOUT Fire Alram System
12- CCTV –IP System in In Driving School For Ladies
Supply and installation IP camera PTZ
Include fiber optic connection network for all camera for monitoring the roods inside
the driving school
14- ASYOUT Installation and Tests 11/66 K.V SS Transformer .
- 40MVA TR with all accessories
- Cable tray and steel support
- CAPACITOR BANK
- H.V cables from GIS to TR ( trough SWGR building )
- M.V cables from TR to M.V SWGR
- M.V cables from M.V SWGR to AUX TR
- Control cables with termination ( for all equipment )
- Earthing grid connecting to exiting grid & lighting protection
16- ASYOUT Lighting System
S No. | Project | Client | Location |
1 | INFRA-STRUCURE OF NETOWK INCLUDE UTP- FIBER –CCTV- WIFI -TELEPHONE SYSTEM AND ALL CIVIL WORK NEED In AL- WAGH AIRPORT AS SUBCONTRACT TO HASOUB COMPANY | GACA | AL-WAGH AIRPORT |
2 | INFRA-STRUCURE OF NETOWK INCLUDE UTP- FIBER –CCTV- WIFI -TELEPHONE SYSTEM AND ALL CIVIL WORK NEED In AL- OLA AIRPORT AS SUBCONTRACT TO HASOUB COMPANY | GACA | AL-OLA
AIRPORT |
3 | LOW CURRENT SYSTEMS INSTALLATION IN THE NEW POST OFFICE BUILDING AS SUBCONTRACT TO TABOUK CONSTRACTION COMPANY | SAUDI POST | TABOUK POST OFFICE BUILDING |
4 | LOW CURRENT SYSTEMS INSTALLATION IN THE NEW POST OFFICE BUILDING AS SUPCONTRACT TO TABOUK CONSTRACTION COMPANY | Ministry of Water | HAQL CITY BER BEN HERMAS
CITY |
5 | INFRA-STRUCURE OF NETOWK INCLUDE UTP- FIBER –CCTV- WIFI – TELEPHONE SYSTEM AND ALL CIVIL WORK NEED
In Municipality of the Governor of the HAQL |
Municipality of the Governor of the HAQL | HAQL |
6 | INFRA-STRUCURE OF NETOWK INCLUDE UTP- FIBER –CCTV- –
TELEPHONE SYSTEM IN General Directorate of Civil Defense |
Civil Defense | TABOUK |
7 | TELEPHONE SYSTEM AND ALL CIVIL WORK NEED IN General
Directorate of Prisons In Tabouk |
Ministry of Interior | General Directorate of Prisons In Tabouk |
8 | LOW CURRENT SYSTEMS INSTALLATION IN THE NEW STUDENT BUILDING AS SUBCONTRACT TO TORAS CONSTRACTION COMPANY | Technical and Vocational Training Corporation | TABOUK TECHNICAL COLAGE BUILDING |
9 | LOW CURRENT SYSTEMS INSTALLATION IN THE NEW LABOUR
OFFICE BUILDING IN TABOUK |
Ministry of Labor | TABOUK |
10 | LOW CURRENT SYSTEMS INSTALLATION IN THE NEW STUDENT BUILDING AS SUBCONTRACT TO TORAS CONSTRACTION COMPANY | Technical and Vocational Training Corporation | HAIL TECHNICAL COLAGE
BUILDING |
11 | INFRA-STRUCURE OF NETOWK INCLUDE UTP- FIBER –CCTV- – TELEPHONE SYSTEM | Ministry of Justice
building |
AMLOG |
12 | COOLENGEL SS POWER TRANSFORMER 11KV M.V SWGR | CCCCC | CCCC |