Upgrade fuel control system
- The scope of the project include
- Installation New flow meters
- Instantiation Temperature measurement,
- Installation Pressure transmitting
- Modify piping system
- Connect the system with fiber link with control room in PP2.
Replacement of Control and Protection System at Tabouk Power Plant
- Install UPS Power Distribution Panel , Batteries ,Battery Charger.
- Install Network Panel and GPS antenna for WAN .
- Modifying the Exiting Operation Console
- Dismantling of exiting Mark-II ,Mark-V Cabinet.
- Installation New Mark-VI Cabinet.
- Dismantling of exiting Excitation Cabinet.
- Installation New EX2100e Excitation Cabinet.
- Make all Mechanical work required for the work.
- Make all the wiring required for the work